
Artist’s making of the future USNS John Lewis (T-AO 205), picture politeness General Dynamics – National Steel as well as Shipbuilding Co
The keel for the future USNS John Lewis (T-AO 205), the Navy’s very first John Lewis- course fleet replenishment oiler, was ceremonially laid at General Dynamics-National Steel as well as Shipbuilding Company, San Diego, May 13.
A keel laying is the ritualistic acknowledgment of the beginning of a ship’s building. In this situation the collaborating the ship’s modular elements as well as the verification or etching of a guest of honor’s initials right into a ritualistic keel plate. The ship’s name, UNITED STATE Representative John Lewis, as well as the ship’s enroller, starlet Alfre Woodard, engraved their initials right into the keel plate.
“We’re honored to have Representative Lewis and Ms. Woodard with us today as we lay the foundation for recapitalizing our nation’s critical fuel-replenishment-at-sea capabilities,” claimed Mike Kosar, Support Ships, Boats as well as Craft program supervisor, at the Navy’s Program Executive Office (PEO)Ships “These ships are steadfast, reliable and allow our warships to defend our freedoms for which Representative Lewis has dedicated his life to protecting.”
The John Lewis- course ships are based upon business style criteria as well as will certainly recapitalize the present T-AO 187-class fleet replenishment oilers to give underway replenishment of gas to united state Navy ships mixed-up. These ships become part of the Navy’s Combat Logistics Force.
J ohn Lewis will certainly be run by the Navy’s Military Sealift Command as well as is the very first ship called after the civil liberties leader as well as Presidential Medal of Freedom recipient. Construction started in September 2018, with distribution intended in late 2020.











