As component of this order, GTT will certainly offer the layout as well as linked design solutions for the containers of the vessel, which will certainly use an ability of 174,000 m3. The containers will certainly be fitted with the GTT NO96 GW membrane layer control system, an innovation created by GTT.
The vessel is arranged for distribution in the 3rd quarter of 2024.
Reference: gtt.fr