Houston-headquartered Helix Energy Solutions Group, Inc. (NYSE: HLX) reviews that it has entered right into a two-year extension of its properly intervention constitution and companies contracts with Petróleo Brasileiro S.A. (Petrobras) for the Siem Helix 2 properly intervention vessel, offshore Brazil. The negotiated extension is scheduled to conclude in December 2024 and instantly follows Helix’s present contracts with Petrobras.
“Market conditions globally and in Brazil have been improving, and demand for our world-class assets and experienced crews has been steadily increasing,” mentioned Helix EVP and COO Scotty Sparks. “We are glad to negotiate this contract extension and look forward to continuing our long and productive working relationship with Petrobras. The Siem Helix 2 has consistently provided industry, and global, leading well intervention services to Petrobras. This two-year extension demonstrates the capacity for Helix to continually provide innovative solutions to fit client needs, backed by our experience and proven track record, and supports our Energy Transition business model of offering clients the ability to maximize production from their existing wells.”
Delivered by German shipbuilder FSG in 2016, the 158.65 meter lengthy Siem Helix 2 is a purpose-built, superior properly intervention vessel able to performing a variety of subsea companies together with manufacturing enhancement, properly decommissioning, subsea set up, offshore crane and remotely operated car operations, offshore building and emergency response. Both Siem Helix 2 and sister ship Siem Helix 1 are on long term charter from Norway’s Siem Offshore.