This Domain is for Sale. To make an offer please get contact.
Make an Offer
  • Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result
No Result
View All Result
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result

MODEC Hits Milestone: First Steel Cut in China for Guyana-Bound FPSO Errea Wittu

marinesalvage by marinesalvage
January 25, 2024
in News
0
MODEC Hits Milestone: First Steel Cut in China for Guyana-Bound FPSO Errea Wittu
Credit: MODEC (file image)

Credit: MODEC (file picture)

Japanese FPSO leasing agency MODEC stated Thursday that the primary steel-cutting ceremony for the Guyana-bound FPSO Errea Wittu had been held in China.

MODEC secured its first order to produce an FPSO to Guyana in May 2023. The order got here from an ExxonMobil-led consortium and is for the deployment of the FPSO to the large Stabroek offshore block in Guyana, where Exxon already has three FPSOs in production, all three supplied by SBM Offshore.

According to World Energy Reports, China’s DSIC has the development hull contract, with Bomesc Offshore Engineering and DynaMac answerable for the topside modules building.

Announcing the primary metal slicing ceremony in China on Thursday, MODEC stated: “FPSO Errea Wittu has reached an important milestone in its journey! After an exciting start with the first steel cutting for the topside’s modules in Singapore, we are proud to announce that the FPSO Errea Wittu has also achieved the first steel cutting milestones in China.”

President and CEO of MODEC in Singapore, Soichi Ide, who was current on the first metal reduce occasions in China, thanked ExxonMobil for entrusting the undertaking to MODEC: “We have a track record for successful project deliveries that we are proud of. Although FPSO Errea Wittu will be MODEC’s first FPSO for use in Guyana, she will be the 18th FPSO/FSO vessel delivered by MODEC for use in South America, out of 54 floating facilities delivered in the world. Thank you for choosing us to be your partner. We are proud to be able to play a part in contributing towards Guyana’s energy future and the economy.”

The Errea Wittu FPSO will be used to develop the Snoek, Mako, and Uaru resources in the Stabroek block. 

Apart from supplying the Errea Wittu FPSO, MODEC will also provide ExxonMobil with operations and maintenance service of the FPSO for 10 years from its first oil production.

The Errea Wittu will be deployed approximately 200 kilometers offshore Guyana, at a water depth of 1690 meters, using a SOFEC Spread Mooring System, and it will be able to store around 2 million barrels of crude oil. ExxonMobil’s co-venturers on the Stabroek block are Hess Guyana Exploration LTD (30%) and CNOOC Petroleum Guyana Limited (25%).

The FPSO will have a topside designed to produce approximately 250,000 barrels of oil per day and will have an associated gas treatment capacity of 540 million cubic feet per day, water injection capacity of 350,000 barrels per day, and produced water capacity of 300,000 barrels per day.

Source of This New

Previous Post

‘Zombie Ships’ Mask Parlous State of Container Shipping Industry

Next Post

VIDEO: Allseas Inaugurates New Barge for Shallow-water Offshore Construction

Related Posts

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

July 13, 2024
capesize bulk carrier terminal iron ore dry bulk
News

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter
News

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV
News

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites
News

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
odfjell
News

Odfjell Announces Layoffs, Reduction of European Officers

July 12, 2024
Next Post
VIDEO: Allseas Inaugurates New Barge for Shallow-water Offshore Construction

VIDEO: Allseas Inaugurates New Barge for Shallow-water Offshore Construction

Quick Search

No Result
View All Result

Recent Posts

  • Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located July 13, 2024
  • Capesize Rates at Six-Year Lows, Could Slide Further July 13, 2024
  • Cold Morning on the Chesapeake July 13, 2024
  • Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV July 13, 2024
  • Eco Marine Power and Nakashima Propeller Cooperate on Composites July 12, 2024

Categories

  • Informative
  • Law & Regulations
  • News
  • Technology
  • Tug&Barge&Salvage
Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

by marinesalvage
July 13, 2024
0

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located By Fathiya Dahrul and Rieka Rahadiana (Bloomberg) — Divers...

Read more
capesize bulk carrier terminal iron ore dry bulk

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
Maritime and Salvage Wolrd News - Latest Ship Technologies

© 2023 - Marine-Salvage.net

Navigate Site

  • Home Page
  • Privacy Policy
  • Contact Us
  • About Us

Follow Us

No Result
View All Result
  • Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage

© 2023 - Marine-Salvage.net

Manage Cookie Consent
We use cookies to optimize our website and our service.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
View preferences
{title} {title} {title}