PHOTOS: First Ship Passes Through Panama Canal’s New Locks
A post-panamax bulk service turned the primary ship to move by means of the Panama Canal’s new locks on Thursday, kicking off a collection of trial runs forward of the expanded canal’s grand opening later this month.
The $5.3 billion enlargement undertaking includes the development of a brand new set of locks on each the Atlantic and Pacific sides and a number of dredging initiatives to create a second lane of visitors alongside the canal. The new locks are a lot wider and deeper than the present locks.
The first run was meant to simulate a southbound transit by means of the brand new Agua Clara locks on Atlantic aspect of the 255-meter-long, 43m broad MV Baroque, which was chartered by the Panama Canal Authority particularly for this function.
The trial runs will assist Panama Canal employees put together for the beginning of business operations on June 27 when the primary vessels will start utilizing the brand new “neopanamax” locks on both ends of the canal. Unlike the prevailing locks, which use locomotives, the brand new locks require the usage of two tugs positioned ahead and aft to information the ships by means of.
For that purpose, Panama Canal pilots and tugboat captains have been required to undergo in depth coaching on the canal’s personal simulator coaching middle and a close-by scale mannequin facility, however there’s nothing like training with the actual factor.
Before heading by means of the brand new locks, the MV Baroque was boarded by Panama Canal pilots earlier than coming into designated canal waters.
Like you will note on this video explaining the operation of the brand new locks, the MV Baroque was met by two tugs, one ahead and one after, earlier than coming into the locks.
The lead tug right here was the Cerro Santiago, certainly one of many constructed by the Panama Canal Authority in anticipation of the brand new locks.
Inauguration of the Third Set of Locks undertaking is scheduled for June 26 with business operations scheduled to start the following day. During the preliminary stage of operation, solely 4 vessels per day can be allowed to make use of the brand new locks to permit employees the prospect to get used to the brand new operation.