The future generation of ferryboat traveling happily cruised right into Belfast Harbour on Wednesday, with Stena Edda endeavor vital last tests prior to it invites travelers on the Belfast to Liverpool path in the coming weeks.

Welcomed by a flotilla of watercrafts, Stena Edda got to dawn after a legendary four-week trip and also over 6 years’ in preparation and also building, consisting of layout advancement in Sweden.
As component of this memorable celebration on its trip, the brand-new sophisticated vessel participated in effective berthing tests at Belfast Harbour’s VT2Terminal A brand-new accessibility ramp has actually been particularly developed to fit the multi-million-pound ferryboat in Belfast.

With 40% even more deck capability, 40% even more cabins and also 30% even more gas effectiveness than present vessels on the path, it will certainly fit approximately 1,000 travelers, 120 cars and trucks in its devoted garage deck and also 3,100 lane metres of products.

It is much more roomy inside with a Sky Bar and also Scandinavian layout offering brand-new degrees of convenience for both products and also traveling visitors. Despite the 215 metres size of the ferryboat, the brand-new port framework will certainly supply much easier and also much faster packing and also discharging for all travelers.

Stena Edda belongs to a nine-figure financial investment by Stena Line in 3 brand-new vessels and also port upgrades, redefining ferryboat traveling in theIrish Sea Stena Edda is the very first of 2 brand-new ferryboats that will certainly operate on the preferred Belfast to Liverpool path.