• Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result
No Result
View All Result
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result

Repairs to Carrier’s Anchor Windlass Completed in Record Time

marinesalvage by marinesalvage
September 28, 2023
in News
0
Repairs to Carrier's Anchor Windlass Completed in Record Time
Sailors aboard USS Nimitz (CVN 68) complete work on the carrier's anchor during an availability in 2015 at Puget Sound Naval Shipyard & Intermediate Maintenance Facility in Bremerton, Washington. (U.S. Navy photo by Petty Officer 1st Class Jason Kofonow)

Sailors aboard USS Nimitz (CVN 68) total work with the provider’s support throughout an accessibility in 2015 at Puget Sound Naval Shipyard & & Intermediate Maintenance Facility in Bremerton,Washington (UNITED STATE Navy image by Petty Officer firstClass Jason Kofonow)(* )&(* )workers and also ship’s pressure interacted to fix the support windlass on USS

Puget Sound Naval Shipyard (CVN 68) in regarding a 3rd of the moment it took formerly.Intermediate Maintenance Facility support windlass is consisted of electric motors, equipments and also various other components in charge of the regulated reducing and also raising of the chain and also support, which can evaluate approximately 200,000 extra pounds on a Nimitz- course carrier.

The a challenging work that needs much preparation and also difficult implementation.Nimitz to It’s and also

According, area supervisors, Shawn Carragher 312, Zac Malone, that became part of current windlass fixings on USS Code (CVN 71), it needed 78 days to finish. Aircraft Carrier Program Office time, the repair service took 25 days, as component of a non-CNO maintenance duration.Theodore Roosevelt stated This, aide job superintendent (topside),

“When the project team received word the starboard anchor windlass experienced a material failure, we had to assume the repair scope would be similar to the CVN 71,” Chris Krueger work needs the know-how and also close partnership with ship’s pressure (A-Nimitz Project and also first “Utilizing the hot wash from CVN 71, the Nimitz met with shipyard stakeholders weekly to incorporate lessons learned from the Theordore Roosevelt repair into technical work documents, and to develop executable plans to efficiently complete the repair within the bounds of the upkeep.”

The), along with Division 38, Division, Shop 11, Marine Machinists, Shop 26, Shipfitters, Shop 740, Welders, Code 56, Riggers, Shop 57, Pipefitters, Shop 71, Pipe Insulators, Shop and also Painters, Blasters 260.3, Tilesetters and also Code, and also Deck Machinery 246, Hydraulics and also Code.Test to Work Control Engineering Division, manager,

According 38, some architectural elements, electric motors and also hydraulic piping needed to be relocated to generate components and also make a work space for auto mechanics. Jason Turner, all equipment oil and also hydraulic liquid in systems associated with or near the windlass workspace needed to be drained pipes. Shop 11 and also 26 likewise bonded pad eyes on the deck of the windlass area to permit the riggers to control decrease equipment as it was transferred to an open location.Also statedShops

“All of this work had to be done before the riggers and shipwrights could install a wood floor on the deck to protect the surrounding structure in the space as the reduction gear was moved,” stated welding architectural things in position and also re-installing hydraulic piping made up the lengthiest leg of the repair initiatives. Carragher quickly as disturbances were re-installed, the ship and also “The reduction gear was rigged and had upper casing removed, and Shop 38 inspected, cleaned, and repaired any broken parts within the gear case. Once the close-out inspection was complete, the upper casing was installed and bolted together. Only then could the reduction gear be rigged into place and bolted down.”

Carragher 38 loaded the decrease equipment with equipment oil and also the hydraulic system with hydraulic oil. As all repair service initiatives were total, a no-load examination was carried out, adhered to by a last tons examination.Shop stated the initiatives of ship’s pressure assisted the group make the repair service in such a brief quantity of time.Once stated

Malone

“A-Division and 1st-Division removed paint, hydraulic piping, and drained fluids from the hydraulic system and reduction gear prior to the ship’s arrival at Bremerton,” to their intricacy, support windlass decrease equipment housings are generally not worked with unless a failing happens.Malone stated “Their efforts saved at least a week of shipyard production efforts and contributed greatly to the speed and success of the repairs.”

Due, manager,

“Rigging is difficult due to the size, shape, and weight of the parts that need to be moved,” 740. Mike Apodaca USS Code obtained underway on schedule “Our riggers have to be creative in selecting rigging paths and methods used so as to not injure personnel or cause further damage to the reduction gear. Also, our Shop 38 team put forth a great effort to work around these parts to successfully repair what had broken.”

13, completely qualified to sustain the objective.Nimitz

Previous Post

Iran Accuses United States Navy of Defending Fuel Smuggling in Gulf Incident

Next Post

Video: Ukraine Hits Two Russian Ships in Strike on Sevastopol

Related Posts

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

July 13, 2024
capesize bulk carrier terminal iron ore dry bulk
News

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter
News

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV
News

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites
News

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
odfjell
News

Odfjell Announces Layoffs, Reduction of European Officers

July 12, 2024
Next Post
Video: Ukraine Hits Two Russian Ships in Strike on Sevastopol

Video: Ukraine Hits Two Russian Ships in Strike on Sevastopol

Quick Search

No Result
View All Result

Recent Posts

  • Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located July 13, 2024
  • Capesize Rates at Six-Year Lows, Could Slide Further July 13, 2024
  • Cold Morning on the Chesapeake July 13, 2024
  • Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV July 13, 2024
  • Eco Marine Power and Nakashima Propeller Cooperate on Composites July 12, 2024

Categories

  • Informative
  • Law & Regulations
  • News
  • Technology
  • Tug&Barge&Salvage
Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

by marinesalvage
July 13, 2024
0

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located By Fathiya Dahrul and Rieka Rahadiana (Bloomberg) — Divers...

Read more
capesize bulk carrier terminal iron ore dry bulk

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
Maritime and Salvage Wolrd News - Latest Ship Technologies

© 2023 - Marine-Salvage.net

Navigate Site

  • Home Page
  • Privacy Policy
  • Contact Us
  • About Us

Follow Us

No Result
View All Result
  • Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage

© 2023 - Marine-Salvage.net

This Domain is for Sale. To make an offer please get contact.
Make an Offer
Manage Cookie Consent
We use cookies to optimize our website and our service.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
View preferences
{title} {title} {title}