This Domain is for Sale. To make an offer please get contact.
Make an Offer
  • Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result
No Result
View All Result
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result

SPOTD: Panama Begins Flooding New Locks for Expanded Canal

marinesalvage by marinesalvage
May 4, 2024
in News
0
SPOTD: Panama Begins Flooding New Locks for Expanded Canal
SPOTD: Panama Begins Flooding New Locks for Expanded Canal

SPOTD: Panama Begins Flooding New Locks for Expanded Canal

[contextly_sidebar id=”emv22bvFl5EH0iihy58zwSgF1icHfp5x”]The Panama Canal Authority and most important contractor Grupo Unidos por el Canal (GUPC) have kicked off the preliminary flooding of the decrease chamber of the Panama Canal’s new Atlantic locks, marking a significant milestone within the multi-billion greenback growth program.

The flooding started with the flip of valves by Panama Canal Administrator Jorge Quijano throughout a ceremony Thursday on the development web site on the outskirts of Colon City.

 

The flooding section kicks off a sequence of operational exams and high quality management that will likely be accomplished within the lead as much as the opening of the brand new Third Set of Locks in 2016.

“This event highlights the magnitude of what we have been working on for the past seven years,” stated Panama Canal Administrator/CEO Jorge L. Quijano. “Filling the locks with water is the culmination of arduous years of labor and the realization that we are within arm’s reach of the completion of one of the most impressive infrastructure projects of our time.”

The preliminary section of flooding will take roughly 5 days and contain the pumping of roughly 50 thousand cubic meters of water per hour from Gatun Lake into the decrease chambers of the brand new lock.

 

The identical course of will then fill the remainder of the Atlantic sections of locks, reaching a water stage of 27 meters above sea stage. Tests and inspections of the chambers and gates are anticipated to take roughly 4 months, in response to the Panama Canal Authority.

Each lock complicated – Atlantic and Pacific – contains 8 rolling gates and 9 water-saving basins with a filling and emptying facet system.

 

“With the addition of these water-savings basins,” stated Quijano, “we will recycle nearly 60 percent of the water used in every lockage, using the world’s most advanced systems and enhancing the Canal’s reliability. With this new phase, expansion nears closer and closer to completion.”

The Panama Canal growth undertaking entails the development of a 3rd lane of visitors, or Third set of Locks, which can permit the passage of bigger vessels and successfully double the Canal’s capability. The new locks are anticipated to turn out to be operational in 2016.

 

 

 

 

SPOTD: Panama Begins Flooding New Locks for Expanded Canal

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content material, insider opinions, and vibrant neighborhood discussions.

Sign Up

Source of This New

Tags: panama canalPanama Canal expansion
Previous Post

Van Oord’s Heavy-Lift Installation Vessel Gets Major Upgrade

Next Post

U.S. Navy to Christen LCS 10 – USS Gabrielle Giffords

Related Posts

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

July 13, 2024
capesize bulk carrier terminal iron ore dry bulk
News

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter
News

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV
News

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites
News

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
odfjell
News

Odfjell Announces Layoffs, Reduction of European Officers

July 12, 2024
Next Post
USS Gabrielle Giffords (LCS 10) rolls out of Austal USA's facility, February 25, 2015. Photo: Austal USA

U.S. Navy to Christen LCS 10 – USS Gabrielle Giffords

Quick Search

No Result
View All Result

Recent Posts

  • Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located July 13, 2024
  • Capesize Rates at Six-Year Lows, Could Slide Further July 13, 2024
  • Cold Morning on the Chesapeake July 13, 2024
  • Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV July 13, 2024
  • Eco Marine Power and Nakashima Propeller Cooperate on Composites July 12, 2024

Categories

  • Informative
  • Law & Regulations
  • News
  • Technology
  • Tug&Barge&Salvage
Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

by marinesalvage
July 13, 2024
0

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located By Fathiya Dahrul and Rieka Rahadiana (Bloomberg) — Divers...

Read more
capesize bulk carrier terminal iron ore dry bulk

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
Maritime and Salvage Wolrd News - Latest Ship Technologies

© 2023 - Marine-Salvage.net

Navigate Site

  • Home Page
  • Privacy Policy
  • Contact Us
  • About Us

Follow Us

No Result
View All Result
  • Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage

© 2023 - Marine-Salvage.net

Manage Cookie Consent
We use cookies to optimize our website and our service.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
View preferences
{title} {title} {title}