The South Carolina Department of Transportation is creating a brand-new top-level fixed-span bridge on United States 21 over the Harbor River in Beaufort County as well as is getting rid of the existing swing-span bridge, which is greater than 78 years of ages.
The brand-new bridge building job is being sustained by Yonges Island, S.C. basedStevens Towing Co It has an agreement to relocate an overall of 65 girders for the bridge from Standard Concrete in Savannah,Ga Each girder is 168 feet long as well as evaluates a little over 100 brief lots.
Charlotte, S.C. headquartered job professional United Infrastructure Group has actually hired one among Stevens Towing’s 260 feet x 52.5 feet x 12 feet inland extremely big receptacle barges to relocate the girders as well as Stevens’ yank Island Fox is managing the tows.
“We just completed our first delivery on July 17th and will be back in Savannah to load the second batch is August,” claimsStevens Towing “We will deliver each batch in groups of 10 girders every few weeks until the job is completed.”
The girders are made by Standard Concrete in Savannah as well as packed onto the barge at at its Savannah River center, which has a barge slip as well as mobile gantry cranes for barge filling procedures.