Technology team Wärtsilä revealed it will provide the melted gas (LNG) fuel gas supply system, propulsion control system and also alarm system surveillance and also control system for 4 brand-new 8200 TEU LNG dual-fuel containerships being developed for Singapore- based Pacific International Lines (PIL) at the Jiangsu New Yangzi Shipbuilding lawn inChina The orders were consisted of in Wärtsilä’s order publication in the 4th quarter of 2022.
Wärtsilä Fuel Gas Supply System (FGSS) will certainly feed LNG gas to power both primary and also supporting engines from the vessel’s 7500 m3 membrane layer storage tank. The FGSS likewise consists of boil-off gas administration and also bunkering terminals, in addition to a Fuel Control System (FCS) entirely incorporated with Propulsion Control System (COMPUTER) and also alarm system surveillance and also control system (MCS).
The Wärtsilä tools is set up for shipment to the lawn in very early 2024, and also the vessels will certainly be provided considerably starting in 2025.