Shipbuilder Vard on Monday held the steel reducing event for a North Star solution procedure vessel at Vard Vung Tau in Vietnam.
This is the 4th SOV to be supplied from VARD to North Star for procedure on the Dogger Bank overseas wind ranch in the UK North Sea.
The newbuild is of the VARD 4 12 style, established by Vard Design in Ålesund,Norway
The SOV will certainly be 78 meters long with a beam of light of 19 meters and also have the ability to fit 60 individuals in solitary cabins.
The crossbreed vessel will certainly be outfitted with a diesel-electric propulsion system, extremely reliable primary props, and also passage thrusters with irreversible magnet electrical motors in mix with Sea Q options provided by Vard Electro in Norway.
North Star, based in the UK, bought the vessel in December 2021.
At the moment of the order, Vard stated the vessel was arranged for shipment in the 4th quarter of 2024.