Search Under Way for Driver After Truck Goes off Chesapeake Bay Bridge

truck overboard
Image politeness Virginia Beach Fire Department

The UNITED STATE Coast Guard is looking for the vehicle driver of a box vehicle that reviewed the side of the Chesapeake Bay Bridge-Tunnel on Tuesday early morning. It was the 2nd occurrence including a vehicle running over the side on the bridge as well as passage complicated because 2017.

According to the bridge’s driver, the vehicle – a tiny two-axle box vehicle, not a tractor-trailer – reviewed at concerning 0820 hrs on the northbound period of the twin bridge, on the north side of the passage section. Witnesses reported seeing a guy leave the vehicle as well as drift west.

When regional cops, fire as well as emergency situation clinical solutions systems reached the scene, the vehicle was still afloat in between both bridge periods, according to theVirginia Beach Fire Department The bridge guardrail as well as the aesthetic were harmed in the collision, as well as emergency situation repair work are in progress.

Search Under Way for Driver After Truck Goes off Chesapeake Bay Bridge

Image politeness Virginia Beach Fire Department

The UNITED STATE Coast Guard Sector Virginia provided a program to ask sailors to maintain a hunt for the missing out on vehicle driver. It additionally sent off a reaction watercraft, the cutter Hawk as well as a Jayhawk helicopter aircrew. The Virginia Marine Resource Commission sent off added watercraft teams, as well as regional cops as well as fire divisions are carrying out a coastline search.

In February 2017, a tractor trailer went off the southbound period of the bridge in gusty winds. The vehicle driver took care of to leave as well as get on top of the still-floating lorry’s taxi, as well as a UNITED STATE Navy helicopter saved him soon after. He passed away of hypothermia throughout transportation to the medical facility as well as his widow sued versus the bridge driver, affirming that vehicles need to not have actually been allowed on the bridge at the time of the occurrence as a result of the dominating wind problems. Wind rates were reduced at the time of Tuesday’s occurrence, listed below the bridge’s 40 miles per hour optimum for vehicle website traffic.