James Fisher and also Sons plc and also Uptime International have actually authorized a memorandum of comprehending to companion for using movement made up gangways in the advancement of the introducing Ulstein SX221 Diamond SOV.
The duo stated that the arrangement would certainly make sure the safety and security and also effectiveness of overseas employees via self-governing and also smart procedures.
The information is connected to the Diamond Consortium’s ULSTEIN SX221 Diamond SOV idea, revealed in June 2022.
With James Fisher standing for the Diamond Consortium, a cooperation with Graig, and also assistance from DNV and also Ulstein Design Solutions, the SOV will solely make use of Uptime’s movement made up gangways for risk-free transport of professionals and also devices in between vessels and also wind turbines.
Jim Hey, team service advancement supervisor at James Fisher stated: “Based on existing task pipes, a minimum of 37 brand-new SOVs are needed to satisfy UK overseas wind need. With over 1500 UK staff members in workplaces throughout consisting of Lowestoft, Barrow- in-Furness, Grimsby and also Aberdeen, in addition to our maritime heritage extending 175 years, James Fisher has the ideal individuals in the ideal locations to bring this cutting-edge vessel to market, putting the UK at the centre of the worldwide overseas wind change.
Related:
“The logistic system is a critical element of SOV design and usage. The combination of James Fisher and Uptime’s expertise and capabilities will shore-up availability of supply with a future-proofed design for gangway technology upgrades. We are thrilled to be working with Uptime and look forward to the next steps in development,” Hey stated.
James Fisher stated it would certainly have accessibility to Uptime’s complete collection of capacities, including its just recently revealed Digital Ecosystem, “ensuring maximum safety and efficiency of operation through autonomous operations including digital tracking of personnel and equipment through the logistic system on to the wind turbine, including use of automated pallet robots.”