• Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result
No Result
View All Result
Maritime and Salvage Wolrd News - Latest Ship Technologies
No Result
View All Result

United States Coast Guard Upgrading A/C Systems On Its Icebreaking Tugs

marinesalvage by marinesalvage
November 1, 2022
in Technology
0
US Coast Guard Upgrading HVAC Systems On Its Icebreaking Tugs
Coast Guard Cutter Katmai Bay (WTGB 101) breaks ice in the Straits of Mackinaw on the Great Lakes. (Photo: Carolyn Cihelka / U.S. Coast Guard)

Coast Guard Cutter Katmai Bay (WTGB 101) breaks ice in the Straits of Mackinaw on theGreat Lakes (Photo: Carolyn Cihelka/ UNITED STATE Coast Guard)

The UNITED STATE Coast Guard stated its In-Service Vessel Sustainment (ISVS) Program has actually passed the middle in its initiative to update the home heating, air flow and also a/c (A/C) systems on the solution’s 140-foot bay-class icebreaking yanks.

The heating and cooling upgrade on Coast Guard Cutter Katmai Bay was finished on June 1– 20 days in advance of routine– in Cheboygan, Mich., near the yank’s homeport of Sault Sainte Marie, Mich.

Meanwhile, Coast Guard Cutter Morro Bay reached Coast Guard Yard in Baltimore June 6 for its heating and cooling upgrades.

Katmai Bay is the fifth of the Coast Guard’s 9 140-foot icebreaking yanks to get the upgrades, either at Coast Guard Yard in Baltimore or at Coast Guard District 9 places near the vessel’s homeport. District 9 incorporates the 5 Great Lakes, the Saint Lawrence Seaway and also bordering locations.

Deploying a group of Coast Guard Yard and also ISVS Project Resident Office Baltimore team to District 9 setups leads to over a month of raised functional time considering that the cutters do not need to take a trip toBaltimore The heating and cooling upgrade takes 8 weeks to finish whether the job is achieved at the Yard or by the Yard group at District 9 places. The Surface Forces Logistics Center Ice Breaker, Buoy and also Construction Tender Product Line supplies assistance throughout the heating and cooling upgrade procedure.

The heating and cooling upgrade, which changes electrical heating systems with a warm water furnace, will certainly enhance the general home heating capability by 80%, the Coast Guard stated. The effects of this upgrade are clear.Lt Dan Jones, regulating policeman of Coast Guard Cutter Thunder Bay, called the enhancements unbelievable after finishing the upgrade procedure in 2021 and also discussed, “We have had no issues keeping the ship warm and comfortable for the entire crew. Previous years we had trouble keeping interior temps at or above the design temperature requirements even with [above normal] exterior temperatures.”

Morro Bay is set up to be back at its Cleveland homeport later on this year. Coast Guard Cutter Bristol Bay will certainly be the following yank to get the heating and cooling upgrade, with the job being finished at its Detroit homeport.

Source of This New

Previous Post

VLS Environmental Solutions Acquires Plaquemine Point Shipyard

Next Post

Australia: Shell Ships LNG from Prelude FLNG Despite Staff Stoppages

Related Posts

MAN Energy Solutions Delivers First Ever Ammonia-Ready SCR to Mitsui
Technology

MAN Energy Solutions Delivers First Ever Ammonia-Ready SCR to Mitsui

July 12, 2024
PPG Unveils New ‘Ultra Low-Friction’ Vessels Coating
Technology

PPG Unveils New ‘Ultra Low-Friction’ Vessels Coating

July 11, 2024
Fortescue Conducts World's First Ammonia Bunker Trial in Singapore
Technology

Fortescue Conducts World’s First Ammonia Bunker Trial in Singapore

July 10, 2024
Brunvoll Inks DP2 Upgrades Deal for More Møkster Vessels
Technology

Brunvoll Inks DP2 Upgrades Deal for More Møkster Vessels

July 10, 2024
Esvagt Picks Brunvoll Propulsion for New SOV
Technology

Esvagt Picks Brunvoll Propulsion for New SOV

July 9, 2024
GE Vernova Notches Singapore Navy Win
Technology

GE Vernova Notches Singapore Navy Win

July 8, 2024
Next Post
Australia: Shell Ships LNG from Prelude FLNG Despite Staff Stoppages

Australia: Shell Ships LNG from Prelude FLNG Despite Staff Stoppages

Quick Search

No Result
View All Result

Recent Posts

  • Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located July 13, 2024
  • Capesize Rates at Six-Year Lows, Could Slide Further July 13, 2024
  • Cold Morning on the Chesapeake July 13, 2024
  • Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV July 13, 2024
  • Eco Marine Power and Nakashima Propeller Cooperate on Composites July 12, 2024

Categories

  • Informative
  • Law & Regulations
  • News
  • Technology
  • Tug&Barge&Salvage
Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located
News

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located

by marinesalvage
July 13, 2024
0

Hunt for Black Boxes Still On After AirAsia Plane’s Tail Located By Fathiya Dahrul and Rieka Rahadiana (Bloomberg) — Divers...

Read more
capesize bulk carrier terminal iron ore dry bulk

Capesize Rates at Six-Year Lows, Could Slide Further

July 13, 2024
jennifer turecamo moran tug chesapeake bay winter

Cold Morning on the Chesapeake

July 13, 2024
Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

Video: Aboard the Mighty CSCL Globe in Felixstowe – ShippingTV

July 13, 2024
Eco Marine Power and Nakashima Propeller Cooperate on Composites

Eco Marine Power and Nakashima Propeller Cooperate on Composites

July 12, 2024
Maritime and Salvage Wolrd News - Latest Ship Technologies

© 2023 - Marine-Salvage.net

Navigate Site

  • Home Page
  • Privacy Policy
  • Contact Us
  • About Us

Follow Us

No Result
View All Result
  • Home
  • News
  • Technology
  • Law & Regulations
  • Informative
  • Tug&Barge&Salvage

© 2023 - Marine-Salvage.net

This Domain is for Sale. To make an offer please get contact.
Make an Offer
Manage Cookie Consent
We use cookies to optimize our website and our service.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
View preferences
{title} {title} {title}