CyberLogitec, a leading company of Maritime, Port/Terminal, and also Logistics procedures IT modern technologies and also subsidiary of EUSU Holdings, introduced that the piece Terminal execution in Brasil Terminal Portu ário has actually finished efficiently in June 2021 with continuous steady procedures.
BTP, a joint endeavor in between APM Terminals and also TIL (Terminal Investment Limited), is the biggest terminal in South America and also has a geographical benefit in giving delivery courses throughout the globe. With the PIECE Terminal system execution, BTP is anticipated to attain the very looked-for impact of boosting the job performance and also ease, preparation in vessel entrance and also separation, and also greater performance in yearly throughput.
“We chose OPUS Terminal since the system is based on best practices around the world and we believe that the system is advanced and stable enough to support us to provide efficient terminal operation and high quality service,” claimed Marcio Guiot, Chief Operating Officer at BTP.
PIECE Terminal’s released ‘Advanced Modules’ boosts the functional performance of the terminal’s lawn and also vessel procedures, reduces unneeded and also ineffective job, reduces the required preparation time while boosting functional performance.
The exact same variation of piece Terminal’s Advanced Modules is being made use of at Westports incurable, the huge container incurable situated in Malaysia, and also several various other CyberLogitec terminals.
The limited motion in between countries arising from COVID-19 was the largest concern for the task. To manage the offered situation, PIECE Terminal task group at CyberLogitec has actually applied the system from another location without a solitary browse through to BTP Terminal throughout the 18 months task duration.
“To achieve a successful remote implementation for the first time, we completed rigorous preliminary planning and preparations, and the establishment of new processes and development. To mitigate the risk of a remote implementation and customer uncertainty, testing was carried out repeatedly. The process and result have been open and transparent to the customer as part of customer communications. Consequentially, we’ve made the successful implementation and reduced the project stabilization period as well.”, claimed Jeong Min Son, Head of Port Department.
Sea News, October 18